Beginning Monday, June 18, the Physical Plant, along with American Masonry, will begin tuckpointing the south elevation of Aquinas Hall. This repair is necessary because of mortar deterioration, allowing water to penetrate into the building.
The project will last approximately three weeks.
For more information call Jim Brummer, (651) 962-6595, or Jerry Anderley, (651) 962-6530.