The Physical Plant, along with Excel Energy, will shut off gas to the entire north campus on Monday, May 21. The shutdown will last from 7 a.m. to approximately 3 p.m.
The south campus and the Minneapolis campus will not be affected. The shutdown is necessary to allow Excel Energy to make necessary repairs to the pressure system.
Thank you for your understanding and cooperation during this time.